Project Experience
CPB Contractors and UGL in a joint venture with Ghella, on behalf of Hatch
Construction of M6 Motorway Stage 1. Sydney, Australia. Traffic engineering advice related to 56-hour phased weekend closures of President St during construction of M6 Stage 1 tunnel. Coordinate Visum traffic modelling teams based in Calgary, Toronto, and Durban, expand on Visum sub-area model of study area in Kogarah Sydney, analyse SCATS traffic count data, extract travel times using Google Distance Matrix API, determine LOS at 15 affected intersections using SIDRA. Technical note summarising results, with traffic engineering mitigation recommendations. 2022.
CAF-TE Joint Venture (one of 3 shortlisted tenderers), on behalf of Hatch
Queensland Rolling Stock Expansion Program – Tender for Proposed Ormeau maintenance depots and stabling yard. Gold Coast, Australia. Traffic engineering advice to JV related to construction and operational traffic generated by the facility. Extraction of Ormeau Emme/4 sub-area network and demand model from the South-East Queensland Strategic Transport Model. Refinement and disaggregation of traffic zones, demand adjustment for 2026 to 2041 forecasts, SIDRA analysis of affected intersections. Prepare traffic engineering input to Tender Advice Notification, summarise results, with recommendations. 2022.
Government of Kenya, Treasury Directorate of Public Private Partnerships, on behalf of Hatch
Toll Operator Feasibility and Procurement. Traffic Engineer within the KPMG-Hatch JV team tasked with developing the Feasibility Study and Procurement Strategy for the Nairobi -Nakuru-Mau Summit section. Review previous First Mover toll feasibility studies, confirm toll plaza and gantry locations, revise toll revenue forecasts, provide traffic inputs to draft feasibility report, interact with various ministries within the Government of Kenya. 2021-2022.
Udinsk Gold, Udinsk Gold FS Project, Khabarovsk Krai, Russia, on behalf of Hatch
Coordinate Durban project team for the preparation of a Traffic Management Plan for the proposed Udinsk Gold Mine. Review overall civil engineering design for the road network, analyse vehicle and equipment requirements, identify traffic conflict points, propose mitigation measures, develop road signage plan, review report, respond to Client comments. 2021-2022
Massachusetts Department of Transportation, on behalf of Hatch
Green Line Type 10 Light Rail Vehicle Procurement. Boston, USA. Legion pedestrian modelling of passenger boardings and alightings, for different rail coach layouts provided by short-listed manufacturers, as part of the tender adjudication process. Compare average effective door opening times and maximum station dwell times, for each layout, as determined from 100 random pedestrian simulations. Prepare Client presentation with recommendations. 2021.
Tongaat Hulett Properties, on behalf of Hatch
Sibaya Strategic Transport Assessment Update. Durban, South Africa. Prepare major update to the Sibaya Coastal Precinct STA, following sale of Node 6 agricultural land to Devmco, a major residential property developer. Review previous work, update the strategic Emme/4 model, assess phased development of Sibaya nodes, extract AM and PM peak hour traffic movements from the Emme/4 model, analyse intersection capacities using SIDRA, submit report and interact with road authorities ETA, SANRAL and KZN DoT for approval of the Sibaya road network master plan. 2021.
Atlantis SEZ, on behalf of Hatch
Site Traffic Assessment. Hatch Cape Town office appointed to prepare the Site Traffic Assessment in support of the Atlantis Green Technology Special Economic Zone and Surrounds Development Plan. Assist with the creation of an Atlantis SEZ sub-area model via extraction from the City of Cape Town’s strategic Emme/4 transport model, calibrate sub-area model to local traffic counts, extract turning movements for SIDRA analysis, incorporate the Koeberg nuclear power station Evacuation Plan, review and sign-off STA report. 2021.li>
Rio Tinto Iron & Titanium, Quebec, Canada, on behalf of Hatch
Pedestrian and vehicle conflict simulation at the RTFT plant located 80 km north-east of Montreal on the banks of the St Lawrence River. Advise Client on feasibility of relocation of personnel to admin block facilities, requiring several daily crossings by personnel of the main through road to access the smelter manufacturing facility, at shift changes and production breaks. 2021.
G2K Connect Consortium (one of 3 short-listed tenderers), on behalf of Hatch
Australian Rail Track Corporation, Inland Rail from Brisbane to Melbourne, Australia – Section from Gowrie to Kagaru. Traffic engineering advice to G2K Connect related to road network design changes submitted as part of the G2K PPP Design and Construct tender. Extraction of Emme/4 sub-area networks and demand models from the South-East Queensland Strategic Transport Model. Refinement and disaggregation of traffic zones, demand adjustments for 2026 to 2041 traffic forecasts, SIDRA analysis. Prepare traffic engineering input to Tender Advice Notifications, summarise results, with recommendations. 2020.
eThekwini Transport Authority, on behalf of Hatch
Development & Design of Truck Stop, Truck Staging Area and Operating Model in the South Durban Basin. Engineering team leader for transportation and traffic modelling team. In-depth review of Port of Durban operations, truck stop and staging international best practice, policy framework, site selection, overall demand and needs assessment. Development of operating business and funding models, concept design and infrastructure implementation programme. 2020-2021.
Gautrain Capacity and Revenue Study, on behalf of Hatch
Engineering team leader for modelling and analytics team, supporting other engineering and planning disciplines in determining fare and non-fare interventions in the existing Gautrain high speed commuter rail network to optimise revenue, increase ridership and stimulate wider economic benefits. Refine and improve existing GRRIN Emme/4 model covering Gauteng province to provide quick turn-around modelling results of specific interventions. Development of innovative pseudo transit lines to emulate connecting modes such as park & ride, drop off, collect and e-hailing. 2020-2021.
Australian Rail Track Corporation, Inland Rail from Brisbane to Melbourne, Australia – Section from Kagaru to Bromelton and Acacia Ridge, on behalf of Hatch
Team leader for traffic studies in support of Environmental Impact Assessment for upgrades to the existing freight rail section, with track lowering at several bridges and construction of new passing loops. Apply SEQ Strategic Transport Model (Emme/4) to assess impact of construction traffic on affected network and intersections. Evaluate long-term road freight movements and determine upgrades or closures of existing level crossings. 2020.
Dube Trade Port Corporation, KZN Automotive Supply Park Township Establishment, on behalf of Gibb
Development of Transport Master Plan as co-consultant with Gibb. Use of the eThekwini Transport Master Plan Emme/4 model to assess short-, medium and long-term transport impact of the ASP on the eThekwini road and public transport network. Preparation of phased Road Infarstructure Upgrade Plan and Public Transport Plan. 2019-2020.
CBGU JV, Cross River Rail Pedestrian Modelling, Brisbane, Queensland, Australia, on behalf of Hatch
Review Legion Pedestrian models developed by Hatch’s modelling team based in Durban for four new high-capacity underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street. Assessment of AM and PM peak hour pedestrian simulations for 2036, and the ultimate design year, including escalator unavailability and Woolloongabba event scenarios. Interact with the architectural design team to confirm robustness of station layout design, identify and resolve pedestrian level of service issues. Extensive engagement with the Delivery Authority and Project Independent Certifier to address all related comments and obtain sign-off of station layouts and pedestrian simulation. 2019-2020.
SANRAL, on behalf of Hatch
N3 PMB Ring Road Route Location. Pietermaritzburg, South Africa. Traffic engineering support for Hatch geometric design team. Strategic transport modelling using TransCAD and Saturn, Traffic engineering and micro-simulation using AIMSUN. 2019-2020.
City of Umhlathuze, on behalf of Escongweni
Proposed Wastewater Re-use Facility. Contracted by Escongweni BPH Engineers to prepare a Traffic Impact Assessment, in support of environmental Basic Assessment Report and SPLUMA applications. Create and calibrate Emme/4 model for Umhlathuze, estimate construction and operational traffic impact of proposed facility. Aimsun and SIDRA for detailed traffic engineering analysis. 2019-2020.
Tongaat Hulett Developments, on behalf of Hatch
Major developments north of Durban, including Ridgeside, Cornubia, Sibaya, Izinga, Inyaninga, Compensation Flats and others. Durban, South Africa. Engineering manager overseeing Hatch transportation planning and traffic engineering teams. Preparation of Strategic Assessments, Public Transport Plans and Traffic Impact Assessments. Interaction with THD-appointed engineering and town planning disciplines. Submission to eThekwini Municipality, KZN DoT and KwaDukuza District Municipality for approvals. 2017 to 2020.
eThekwini Transport Authority, on behalf of Hatch
Refinement of Phase 1 Integrated Public Transport Operational Plan. Durban, South Africa. Engineering manager, overseeing Hatch transportation planning and public transport modelling team for the operational roll out of the C3 Bus Rapid Transit corridor. Demand and patronage analysis using TransCAD model, preparation of input data for IPTN grant application from NDoT, various other supporting functions. 2017.
China Communications Construction Company, on behalf of Hatch
Moloto Corridor Feasibility Review. Tshwane, South Africa. CCCC engaged Hatch to review the 2014 SMEC Feasibility Study and to develop an updated project scope, costing and implementation schedule. Traffic and Transportation engineer, within Hatch’s multi-disciplinary review team. Evaluation of the transportation structure, preferred rail option, overall approach, feeder bus routes and integration into existing commuter rail network. Assessment of project rationale, land-use perspectives and economic impact. Additional demand analysis using GITMP25 Emme model to confirm demand forecasts, mode share, rail, and bus feeder patronage. Preparation of report chapters and recommendations. 2017.
Gauteng Dept of Roads and Transportation, on behalf of Hatch
PWV17 Preliminary Design. Gauteng, South Africa. Traffic engineering support for Hatch geometric design team. Interchange conceptual design, strategic transport modelling (GITMP25 Emme/4 model), Traffic simulation (AIMSUN). 2017.
GMA. Gautrain Rapid Rail Integrated Network, on behalf of SMEC
Johannesburg South Africa. External review of GRRIN Emme model and strategic modelling advisor, as well as interaction with external auditor (Rob Bain). 2016.
Gauteng Province, on behalf of Hatch
Gauteng City Region Integrated Infrastructure Master Plan. Johannesburg South Africa. Transport contribution for multi-disciplinary Hatch team, to develop the GCRIIMP. 2016.
City of Johannesburg. Integrated Public Transport Network – BRT operational design, on behalf of Hatch
Johannesburg, South Africa. Development of TransCAD modelling tools and scripts, in support of Hatch operational design for CoJ BRT system. 2016.
Msunduzi Municipality, on behalf of Hatch
Msunduzi IRPTN Detailed Operations and Business Plan. Pietermaritzburg, South Africa. Technical lead, traffic modelling team. Direct application of the Msunduzi 4-step TransCAD strategic model to refine the Operational Plan and fleet requirements, in support of the detailed design, the business plan and the definition of IRPTN contracts. Model automation, quality control and documentation. 2015.
eThekwini Transport Authority, on behalf of Hatch
eThekwini Transport Master Plan and Implementation Programme. Durban, South Africa. Technical lead, transport planning and modelling. Preparation of transport infrastructure strategy, inclusive of major roads, public transport, freight and rail infrastructure. Formulation of 20-year implementation programme summarising prioritised projects, budgets and funding for each five-year period up to 2035. Extensive use and development of eThekwini’s Macro Transport Model, running on Emme/4 platform. 2014.
eThekwini Transport Authority, on behalf of Hatch
eThekwini IRPTN Operational Plan Refinement. Durban, South Africa. Technical lead, transport planning and modelling. Build and apply detailed public transport model in TransCAD in support of the detailed operational plan, for development of IRPTN contracts and to inform detailed design consultants. 2014.
The Lion Match Company, on behalf of Hatch
Proposed new Head Office and Distribution Centre. Durban, South Africa. Traffic Impact Assessment, inclusive of heavy vehicle movements, AIMSUN micro-simulation and analysis. 2013.
Msunduzi Municipality, on behalf of Hatch
Preliminary Design of the Msunduzi Integrated Rapid Public Transport Network. Pietermaritzburg, South Africa. Built, calibrated and tested AIMSUN micro-simulation model of the BRT corridor, 85 intersections and 34 routes to assess traffic impact on the corridor and CBD. 2013.
Msunduzi Municipality, on behalf of Hatch
Preliminary Design of the Msunduzi Integrated Rapid Public Transport Network, Pietermaritzburg, South Africa. Technical lead, traffic modelling team. Build and calibrate new strategic transport model using TransCAD to assess the operational performance of proposed IRPTN. Inform design and financial teams of patronage statistics and fleet requirements. 2013.
eThekwini Transport Authority, on behalf of Hatch
eThekwini Macro Transport Model Update, Durban, South Africa. Technical lead, traffic modelling team. Update and calibrate the existing Emme/3 Durban strategic transport model. 2012.
Tongaat Hulett Developments, on behalf of Hatch
eThekwini Transport Authority, Greater Umhlanga Model, Durban, South Africa. Technical lead, traffic modelling team. Build new 980 zone SATURN traffic model to assess immediate and ultimate land-use development in Umhlanga. 2012.
South African National Roads Agency Ltd, on behalf of Hatch
N3 Capacity Improvements and Pietermaritzburg Bypass, Durban, South Africa. Technical lead for traffic modelling team tasked with estimating the future demand and determining capacity requirements. Tools included traffic modelling software such as Saturn, Sidra and Aimsun as well ancillary CAD and GIS support packages. 2012.
ETA. eThekwini Freight Corridor, from Port of Durban to Cato Ridge, Durban, South Africa, on behalf of Hatch
Traffic demand modelling using Emme, financial feasibility, investigate funding mechanisms. 2011..
Tongaat Hulett Developments, on behalf of Hatch
Research Greater Umhlanga Model and related traffic surveys, Durban, South Africa. Trip generation research, report findings, engage ETA and NDoT on re-evaluation of trip generation rates. 2010.
eThekwini Transport Authority, on behalf of Hatch
eThekwini Integrated Rapid Public Transport Network, Durban, South Africa. Public transport demand forecasting and assessment of Emme transit assignments. GIS interfacing software. 2010
Tongaat Hulett Developments, on behalf of Hatch
Sibaya Node 1 Traffic Roads Layout Assessment, Durban, South Africa. Saturn modelling and assessment. 2010.
Tongaat Hulett Developments, on behalf of Hatch
Kwadukuza Traffic Impact Assessment, KwaZulu Natal, South Africa. Saturn modelling and evaluation. 2010.
National Department of Transport, on behalf of RHDHV
FIFA 2010 World Cup, Aviation Sub-Sector Task Team, Johannesburg, South Africa. Specialist Transport Modeller. Estimation of air passenger demand, model development, runway capacity analysis and the formulation of appropriate action plans for the aviation industry (airlines, airports and air traffic control). 2010
Department of Transport & Main Roads, on behalf of MWH
Cunningham Highway Needs Assessment and Feasibility Study, Brisbane, Australia. Team Leader, Transport Planning and Traffic Modelling. Development of a long-term corridor plan for the Cunningham Highway, inclusive of future form and function of the highway, land use development and public transport management. 2009
Queensland State Government, on behalf of MWH
Port of Brisbane, Motorway Upgrade, Value for Money Business Case, Brisbane, Australia. Technical lead for a 5-member modelling team. Create multi-class SATURN toll model to estimate patronage and to advise the engineering, environmental, financial and economic, work streams on traffic forecasts, with a strong focus on freight movement. 2008-2009.
Brisbane City Council, on behalf of MWH
Eagle Street Traffic Diversion and Design Appraisal, Brisbane, Australia. Technical lead for a 4-person modelling team. Analyse various options using Saturn, SIDRA and a Paramics micro-simulation model. Field inspections and analysis of prevailing traffic conditions and pedestrian safety. 2008
Queensland State Government, on behalf of MWH
Gold Coast Rapid Rail, Concept Design and Impact Management Plan, Brisbane, Australia. Technical lead for a 4-person modelling team. Completion of final reports for submission to Qld State Govt. 2008
Bouygues Travaux Publics, on behalf of MWH
Brisbane City Council. Northern Link toll tunnel Concession, Brisbane, Australia. Develop Emme/3 toll model for target years 2016 and 2026, estimate toll revenue stream and advise the client and potential banking partners as to the project’s financial viability. 2008
Johannesburg Roads Agency, on behalf of SSI
Traffic Diversion at Gautrain Stations Investigate and monitor traffic conditions associated with the construction of three underground Gautrain rapid rail stations (Park, Rosebank and Sandton), Johannesburg, South Africa. Estimation and refinement of traffic demand, building and validating new Aimsun traffic models, evaluate and report to JRA. 2008
Earlybird Farms, on behalf of SSI
Feasibility of outsourcing Earlybird Farm’s transport distribution operated by their in-house fleet of 80 refrigerated 30-ton trucks, Johannesburg, South Africa. Project leader of a small task team comprising Earlybird’s logistic personnel and SSI’s modelling and financial experts. Optimisation of distribution operation, preparation of contract documents, adjudication and award of outsourcing tender. 2008
SA National Roads Agency Ltd, on behalf of SSI
K99 Toll Tunnel Feasibility, Saturn model development, toll strategy analysis, financial analysis and engineering feasibility, Pretoria, South Africa. Specialist modelling consultant. Configuration of the toll model, sensitivity testing, data extraction, coordination of engineering teams, cost estimates, financial modelling and cost benefit analysis. 2008
eThekwini Transport Authority, on behalf of SSI
Durban CBD Public Transport Plan. Development of a new public transport distribution system in the Durban CBD, to be constructed in time for the 2010 World Cup, Durban, South Africa. Specialist modelling consultant. Management of the modelling team, Emme/2 strategic modelling, Aimsun micro-simulation modelling, model calibration and validation, design of bus/tram routes and schedules, cost estimates. Development of a Business Plan for World Cup funding application submitted to Treasury. 2007
MBombela District Council, on behalf of Delca Systems
MBombela Transportation Study, Regional transportation study, with specific reference to restructuring of the public transport system and a focus on 2010 World Cup demand. Emme / 2 model calibration and validation, and the creation of an evaluation framework containing key performance indicators for assessing the relative merits of public transport alternatives. 2006
Heneways Freight Services
Database design and conversion of new fully integrated freight accounting and operational system, Johannesburg, South Africa. Data conversions of existing system, relational database design, software development and project management. 2005-2006
SANRAL, on behalf of SSI
Upgrading of the N12 motorway, Gillooly’s to Rietfontein interchange, Johannesburg, South Africa. Co-ordinate Saturn and Aimsun model development, assess intersection capacity at all affected interchanges, cost-benefit analysis, toll stream forecasts and project management. 2004
PWV Consortium, on behalf of SSI
GPLUM (Gautrans Projective Land Use Model) development. Develop existing land use database using Access 2000 and Planet GIS, develop Lowry land use model for placement of population and employment projections for future years, develop spatial queries for visual display of land use database, interact with traffic model and develop suitable data exchange interfaces. 2004
SANRAL, on behalf of SSI
N2 Wild Coast Consortium - Initial and final phases of scheme development, South Africa. Traffic model build and calibrate, income projections, scenario testing. 2003
SANRAL, on behalf of SSI
Gauteng Super Highways Toll Consortium - Initial and final phases of scheme development, Johannesburg, South Africa. Traffic model build and calibrate, income projections, scenario testing. 2003
ShipShape Software
Development and support of ShipShape’s software suite for application in the freight forwarding and clearing industry, Johannesburg, South Africa. Team leader - Manage small team of programmers to convert Clipper software to Windows format, using Delphi and SQL Server. 2002
Micro-Alert Pty Ltd
Continuous software support for Micro-Alert’s automatic fuel dispensing equipment, Johannesburg, South Africa. Refine and improve process control and database software written in PowerBasic and Visual Basic, to track fuel issues and consumption, for various Micro-Alert clients (Impala Plats, AngloGold, Clover, ABI, Nuclear Energy Corporation, etc). Interface to Access and SQL Server databases. 2001
Gauteng ERMS, Tshwane Metro, on behalf of SSI
Development and refinement of emergency response simulation software with GIS interface, Johannesburg, South Africa. Simulation model development to assess the impact of various configurations of emergency facilities and vehicle fleet placements. 2000
Bakwena Consortium, on behalf of SSI
Platinum Toll Highway, Pretoria, South Africa. Recalibration of the traffic model in support of the Best and Final Offer (BAFO) for the N4 toll concession. 2000
Gautrans
Gauteng Toll Network development, Pretoria, South Africa. Traffic modelling, project management, scenario testing. 1999
Durban Metro, on behalf of SSI
Fundamental restructuring of the Durban Public Transport Network, Durban, South Africa. Traffic modelling, Project management, co-ordination and client liaison, scenario testing. 1999
Bakwena Consortium, on behalf of SSI
Platinum Toll Highway, Pretoria, South Africa. Creation of a Saturn traffic model, for generation of toll revenue streams and testing of toll strategies, in support of a tender for the Build Operate and Transfer (BOT) bid for the N4 toll concession. 1999
East London Metro, on behalf of SSI
East London CBD and Vincent Berea Traffic Studies, East London, South Africa. Development of Saturn model for assessment of traffic impact of developments applications. 1998
N1 Gateway Consortium, on behalf of SSI
N1 Gateway Toll Highway – Unsolicited Bid, Johannesburg, South Africa. Application of the PWV traffic model using Emme/2 to model toll revenue streams, in support of an unsolicited bid to the DOT for the BOT N17/N1 toll highway concession. 1998
Greater Pretoria Metro Council, on behalf of SSI
MCDC Study, Pretoria, South Africa. Assess the impact of various land-use scenarios within the Mabopane Centurion Development Corridor, using the Emme/2 Premet model. 1998
GPMC, on behalf of SSI
Restructuring of Emergency Services, Johannesburg, South Africa. Develop simulation software to determine average speed of response to emergency incidents, in order to assess the impact of various configurations of GPMC emergency facilities and vehicle fleets. 1998
Mr Gary Dos Rios, Bedfordview Extension 461
Sub-division and development of residential township, Johannesburg, South Africa. Civil Engineering Contractor Project management, design and construction of engineering services (bulk earthworks, roads, storm water, sewers, water supply), liaison with local authority. 1998
Alberton Town Council
Thokoza Sports Stadium. The construction of sports stadium, main pavilion, soccer fields, tennis and netball courts, athletics facilities, using locally-based labour and sub-contractors, training and development of labour and emerging contractors, Alberton, South Africa. Civil Engineering Contractor. In personal capacity tendered for, and was awarded this labour-intensive project. Managed all aspects of project management, procurement, labour, plant, financing, cost control, client liaison, preparation of monthly certificates, etc. 1996-1998
CSIR, Dept of Arts, Culture, Science and Technology, SA Police Services
Crime Research Project, Operational analysis of crime information for the prevention and management of crime, Pretoria, South Africa. Operational analysis of crime information for the prevention and management of crime. Systems analysis and preparation of functional specification report. 1998
Benefits Group
Industrial Relations and the New Labour Act, Johannesburg, South Africa. Data compilation and preparation of final multi-media electronic report, using Microsoft Multimedia Development Kit, C++ and MS Macro Assembler. Publication of multi-media CDROM for distribution to clients of the Benefits Group. 1997
Pretoria City Council
Esselen Street Renewal, Pretoria, South Africa. Data collection, compilation and preparation of multi-media electronic report, using Microsoft Multimedia Development Kit, C++ and MS Macro Assembler. Publication of multi-media electronic report on CDROM, for internal distribution to Council Officials, in support of Plan Associates urban renewal proposals for Esselen Street, Sunnyside. 1996
Mackinnon Development Trust
Bedfordview Extension 437, Sub-division and development of residential township, Johannesburg, South Africa. Civil Engineering Contractor. Project management, design and construction of engineering services (bulk earthworks, roads, storm water, sewers, water supply). 1996
Roylan cc
Castleview Extension 3, Preparation of storm water flood report in support of the client's township development application, Germiston, South Africa. Survey of flood plain and cross-sections, computer simulation of 20 - and 50-year flood contours (software custom-written in C++), recommendations, preparation and submission of report. 1996
Zoe Real Estates
Traffic impact report in support of client's rezoning application, Germiston, South Africa. Traffic data collection, liaison and correspondence with local and provincial authorities, preparation and submission of report. 1996
PWV Consortium, on behalf of SSI
Vectura Public Transport and Toll Road Studies, Pretoria, South Africa. GIS development to assess land-use impact of various proposals. Preparation and presentation of study results using PowerPoint with multi-media components. 1996
Heneways Freight Services
Implement corporate E-mail system, Johannesburg, South Africa. Research available e-mail systems, co-ordinate installation of Diginet lines, purchase, install, test and implement, train personnel. 1996
John Howarth Investments
Town Lodge, Traffic impact report in support of client's rezoning application, for new Town Lodge in Russell Road, opposite Germiston Lake, Germiston, South Africa. Traffic data collection, liaison and correspondence with local and provincial authorities, preparation and submission of report. 1995
Midrand Town Council
Midrand Strip Urban Development Guidelines, Midrand, South Africa. Data collection, compilation and preparation of multi-media electronic report, using Microsoft Multimedia Development Kit, C++ and MS Macro Assembler Publication of multi-media electronic report on CDROM, for distribution to Council Officials and developers, in support of Plan Associates development guidelines. 1995
Micro-Alert Pty Ltd
Automatic Fuel Issuing Systems. Process control and database management software development, Johannesburg, South Africa. Systems analysis, design and development of Micro-alert's software packages for the control and management of in-house fuel pumps, for various clients (Atomic Energy Corporation, AECI, De Beers, Ergo, Barlows, Voltech, Iscor, etc). Software written in Microsoft Basic PDS, Clipper, MS Visual Basic and MS Macro assembler. 1993-1994
PWV Consortium, ob behalf of SSI
Vectura Prompta. Land-use and transportation mapping for "quick response" evaluation of the impact of informal settlements on the PWV transport system, Pretoria, South Africa. Design and develop custom-written software (in MS Basic PDS) to display and map various land-use and transportation components and modelling results. 1992
Baldwins Steel
Purchase Order Control System. Implementation of a comprehensive steel purchase order control system, Boksburg, South Africa. Design and write software to implement a full purchase order control system, with EDI transfers between Baldwins branches and Iscor (1991-1996). Software written in BBX, Clarion and C++.1991-1992
DOT, on behalf of SSI
Bus Contracts. Development of software for management and monitoring of DOT bus contracts, Johannesburg, South Africa. Analysis of passenger statistics and operational costs; development of comprehensive monitoring software (written in Clarion, and C). 1991-1992
DOT, on behalf of SSI
JOMET. Masstran Transportation Study, Investigation into a mass transit system for Greater Johannesburg, Johannesburg, South Africa. Modelling assistance, software design and development of equilibrium traffic assignment module and plot routines (software custom-written in Turbo Basic), for Minitramp modelling. 1989-1990
Bloemfontein Metro, on behalf of SSI
Bloemet Transportation Study, Bloemfontein, South Africa. Development of PLUM land-use and Minitramp transportation models for the purpose of establishing a 10-year road master plan. Design and development of equilibrium assignment module and plotting software. 1988
Heneways Freight Services
Freight Accounting and Management Software, Johannesburg, South Africa. Development of an integrated freight forwarding accounting system with air and sea freight consignment registers linked to recoverable disbursement controls in the general ledger, accounts receivable/payable, invoicing, etc. Team leader for small software team tasked with design, systems analysis, project management, software development in BBX, network implementation. 1987-1988
DOT, on behalf of SSI
Bus Demonstration Projects. Pilot project for the DOT to assess the viability of replacing the subsidy system with formal contracts, inclusive of contract supervision/monitoring services, Johannesburg, South Africa. Compilation of initial draft contract documents, with emphasis on electronic ticket issuing machines. 1986
PWV Consortium, on behalf of SSI
PWV Transportation Study, Pretoria, South Africa. Transportation modelling and evaluation of the 1985, 2000, 2010 land-use scenarios, to develop the PWV provincial road network and prioritize the 10-year road construction programme. 1986
Kangwane Govt, on behalf of SSI
Kangwane Transport Model. Survey of existing road network infrastructure, development of a land-use transportation model to project current and future demand, preparation of a road master plan and 10-year construction programme, Kangwane, South Africa. Minitramp model development and calibration, evaluation of scenarios, preparation and submission of report, development of plotting software (in MS QuickBasic) to supplement Minitramp. 1986
Boerplan Pty Ltd
Agricultural software development and sales to farmers, Johannesburg, South Africa. Technical Director. Responsible for system analysis, design, software development and support of several pc-based farming packages (written in MS Basic, Kbasic, 8080, Z80 assemblers). 1983 -1986
Various
Commercial software development, Debtors, Creditors, Wages, General Ledger, Stock Control, Johannesburg, South Africa. Free-lance. Systems analysis, design and development of commercial software, for use on CP/M and MSDOS personal computers (software written in MS Basic, Dbase II, Kbasic, 8080 and Z80 assemblers). 1980-1983
Johannesburg City Engineer
Edenvale Bus Study, Johannesburg, South Africa. Analysis of Edenvale bus contract, routes, frequencies, fares, subsidies and development of contract conditions and specifications, for the Edenvale Town Council. Conduct the study, make recommendations, prepare and submit report. 1980
Johannesburg City Engineer
Eloff Street Bus way. Analysis of passenger demand and shelter requirements for the Eloff Street Bus Way and Johannesburg Cross City services, Johannesburg, South Africa. Develop a simulation model (written in Fortran) to predict bus passenger arrivals at stops, determine queue lengths and shelter dimensions, prepare and submit report. 1980
Johannesburg City Engineer
JOMET Transportation Study, Johannesburg, South Africa. TRAMP modelling, and evaluation of public transport aspects of model results, development of plotting software (Fortran) for TRAMP. 1979-1980
Johannesburg City Engineer
Various civil design projects, Johannesburg, South Africa. Graduate engineer in training. Design horizontal and vertical alignments for Empire Road reconstruction and Container Terminal roads, storm water, prepare specifications and contract documents. Structural design of Lenasia sewerage pump station, hydraulic and structural design of Venturi flume, implementation of quality control system at asphalt plant and bitumen laboratory, various other minor projects. 1975-1977